Construction Productivity and Constraints for Concrete Pavement Rehabilitation in Urban Corridors

Abstract

A constructability analysis tool was developed to help the California Department of Transportation (Caltrans) determine which rehabilitation and construction strategies were the most feasible in an urban environment to maximize production and minimize traffic delay. With the assistance of California concrete paving contractors, the constructability analysis explored the effects of the following parameters on the construction production of concrete pavement rehabilitation in California: pavement thickness, concrete material, curing time, number and capacity of resources, number of lanes to be paved, type of construction scheduling, and alternative lane closure strategies. The constructability analyses indicated that the proposed Caltrans strategy to rebuild 6 lane-km within a 55-h weekend closure period had a low probability of success. The analyses showed that the concrete curing time was not the most critical activity for the overall production. Material delivery resources, such as dump trucks for demolition and concrete delivery trucks, were the major constraints that limited production. An increase in the concrete slab thickness from 203 to 305 mm reduced the level of production by about 50 percent. A concurrent-construction working method was more productive than a sequential-construction working method. The number of lanes to be paved affected the production capability. Continuous closures were more productive and less inconvenient to the public than weekend-only closures.

Get full access to this article

View all access and purchase options for this article.

References

1. Guidelines and Methodologies for the Rehabilitation of Rigid Highway Pavements Using Asphalt Concrete Overlays. Pavement Consultancy Services, Beltsville, Md., 1991.
2. Secmen S., Schwarz J., Anderson S., and Zollinger D. Accelerated Construction Methodology for Concrete Pavements at Urban Intersections. Research Report 1454-1F. Texas Department of Transportation, Austin, 1996.
3. Ten-Year State Highway System Rehabilitation Plan 1998–99 through 2007–08. Maintenance and Transportation Programming, California Department of Transportation, Sacramento, 1998.
4. Invitation to PCCP Lane Replacement Team Meeting from Caltrans Office of Roadway Maintenance. Office of Roadway Maintenance, California Department of Transportation, Sacramento, April 1, 1997.
5. Harvey J., Roesler J., Farver J., and Long F. Investigation on Design and Construction Issues for Long Life Concrete Pavement Strategies. Draft Report. University of California, Berkeley, 1998.
6. Conrad J. How a Highway Agency Closed an Interstate and Won Public Acclaim. Hot Mixed Asphalt Technology, Vol. 3, No. 4, 1998.
7. Johnston D. Linear Scheduling Method for Highway Construction. Journal of Construction Division, ASCE, Vol. 107, No. 2, 1981.
8. Vorster M., and Bafna T. Discussion of “Formal Development of Line-of-Balance Technique” by Al Sarraj Z. M. Journal of Construction Engineering and Management, ASCE, Vol. 118, No. 1, 1992.
9. Nam D., Lee J., Dunston P., and Mannering F. Analysis of the Impacts of Freeway Reconstruction Closures in Urban Areas. In Transportation Research Record 1654, TRB, National Research Council, Washington, D.C., 1999.

Cite article

Cite article

Cite article

OR

Download to reference manager

If you have citation software installed, you can download article citation data to the citation manager of your choice

Share options

Share

Share this article

Share with email
EMAIL ARTICLE LINK
Share on social media

Share access to this article

Sharing links are not relevant where the article is open access and not available if you do not have a subscription.

For more information view the Sage Journals article sharing page.

Information, rights and permissions

Information

Published In

Article first published: January 2000
Issue published: January 2000

Rights and permissions

© 2000 National Academy of Sciences.
Request permissions for this article.

Authors

Affiliations

Eul-Bum Lee
University of California Berkeley, Department of Civil and Environmental Engineering, Construction Engineering and Management, 215 McLaughlin Hall, University of California, Berkeley, CA 94720
C. William Ibbs
University of California Berkeley, Department of Civil and Environmental Engineering, Construction Engineering and Management, 215 McLaughlin Hall, University of California, Berkeley, CA 94720
John T. Harvey
University of California at Berkeley Pavement Research Center, 1353 South 46th Street, Building 480, Richmond, CA 94804
Jeff R. Roesler
University of California at Berkeley Pavement Research Center, 1353 South 46th Street, Building 480, Richmond, CA 94804

Metrics and citations

Metrics

Journals metrics

This article was published in Transportation Research Record: Journal of the Transportation Research Board.

VIEW ALL JOURNAL METRICS

Article usage*

Total views and downloads: 45

*Article usage tracking started in December 2016


Altmetric

See the impact this article is making through the number of times it’s been read, and the Altmetric Score.
Learn more about the Altmetric Scores



Articles citing this one

Receive email alerts when this article is cited

Web of Science: 0

Crossref: 11

  1. A Decision Support Framework for Assessing the Contextual Factors for ...
    Go to citation Crossref Google Scholar
  2. Measuring Networkwide Traffic Delay in Schedule Optimization for Work-...
    Go to citation Crossref Google Scholar
  3. Optimizing the Rehabilitation Efforts of Aging Transportation Networks
    Go to citation Crossref Google Scholar
  4. A Method for Highway Agency to Estimate Highway Construction Durations...
    Go to citation Crossref Google Scholar
  5. Production Rates of Highway Construction Activities
    Go to citation Crossref Google Scholar
  6. Integrated Design/Construction/Operations Analysis for Fast-Track Urba...
    Go to citation Crossref Google Scholar
  7. Minimizing Total Cost for Urban Freeway Reconstruction with Integrated...
    Go to citation Crossref Google Scholar
  8. Accelerated Pavement Rehabilitation and Reconstruction with Long-Life ...
    Go to citation Crossref Google Scholar
  9. Knowledge-Based Scheduling Analysis Software for Highway Rehabilitatio...
    Go to citation Crossref Google Scholar
  10. Case Study of Urban Concrete Pavement Reconstruction on Interstate 10
    Go to citation Crossref Google Scholar
  11. Construction Productivity Analysis for Asphalt Concrete Pavement Rehab...
    Go to citation Crossref Google Scholar

Figures and tables

Figures & Media

Tables

View Options

Get access

Access options

If you have access to journal content via a personal subscription, university, library, employer or society, select from the options below:


Alternatively, view purchase options below:

Purchase 24 hour online access to view and download content.

Access journal content via a DeepDyve subscription or find out more about this option.

View options

PDF/ePub

View PDF/ePub