Skip to main content
Intended for healthcare professionals
Restricted access
Research article
First published January 2001

Allocation of Risks Under Build-Operate-Transfer Delivery Approach for Transport Infrastructure Projects

Abstract

The need for the build-operate-transfer (BOT) approach in the development of infrastructure projects has risen in recent years, due to budgetary and financial constraints faced by the public sector in both developing and developed countries, tightened by the necessity to repair, maintain, and modernize the existing infrastructure facilities. Risk factors that influence the parties of a prospective BOT contract during the various phases of the contract are presented. In particular, the factors pertaining to the precontract stage and to the political, construction, commercial, and financial categories of possible risks are addressed. Integrated schemes assimilating the risks involved and the corresponding alleviation measures are offered.

Get full access to this article

View all access and purchase options for this article.

References

1. United Nations Commission on International Trade Law (UNCITRAL). Preparatory Measures. Privately Financed Infrastructure Projects, A/cn.9/438/Add3, Chapter V, 30th session, Vienna, Austria, 1997.
2. Castillo E. Financing of Road Transportation Infrastructure in Small Developing Countries. Presented at 13th World Meeting of the International Road Federation, Toronto, Ontario, Canada, June 1997.
3. Grigg N. S. Infrastructure Engineering and Management. John Wiley and Sons, New York, June 16–20, 1988.
4. Wang S. Q., Tiong L. K. R., Ting S. K., and Ashely D. Evaluation and Management of Political Risks in China’s BOT Projects. Journal of Construction Engineering and Management, Vol. 125, No. 3, May–June 1999, pp. 190–197.
5. Wang S. Q., Tiong L. K. R., Ting S. K., and Ashely D. Evaluation and Management of Political Risks in China’s BOT Projects. Journal of Construction Engineering and Management, Vol. 126, No. 3, May–June 2000, pp. 242–250.
6. Malini E., and Raghavendra B. G. Risk Analysis of BOT Approaches for Developing Transport Infrastructure. International Association for Traffic and Safety Sciences Research, Vol. 20, No. 1, 1996, pp. 112–120.
7. Tiong L. K. R., and Alum J. Automated Approach to Negotiation of BOT Contracts. Journal of Computing in Civil Engineering, Vol. 11, No. 2, 1997, pp. 121–128.
8. Mao C.-K., and Chang L.-M. BOT Financing in Public Infrastructure Projects. Construction Congress VI, Feb. 2000, pp. 868–877.
9. Oztemir B., and Weber S. BOT Risks and Their Correlations. Construction Congress VI, Manila, Philippines, Feb. 2000, pp. 837–846.
10. Nielsen K. R. Risk Allocation in Design-Built and BOT Projects. Proc., 1st International Civil Engineering Conference, Manila, Philippines, Feb. 1998, pp. 37–53.
11. Tiong L. K. R. Risks and Guarantees in BOT Tender. Journal of Construction Engineering and Management, ASCE, Vol. 121, No. 2, June 1995, pp. 183–187.
12. Tiong L. K. R. CSFs in Competitive Tendering and Negotiation Model for BOT Projects. Journal of Construction Engineering and Management, ASCE, Vol. 122, No. 3, Sept. 1996, pp. 205–211.
13. Tiong L. K. R. Final Negotiation in Competitive BOT Tender. Journal of Construction Engineering and Management, ASCE, Vol. 123, No. 1, March 1997, pp. 6–10.
14. Ngee L., Tiong L. K. R., and Alum J. Automated Approach to Negotiation of BOT Contracts. Journal of Computing in Civil Engineering, Vol. 11, No. 2, April 1997, pp. 121–128.
15. Tiong L. K. R. Impact of Financial Package Versus Technical Solution in a BOT Tender. Journal of Construction Engineering and Management, ASCE, Vol. 121, No. 2, Sept. 1995, pp. 304–311.
16. Wang S. Q., Tiong L. K. R., Ting S. K., Chew D., and Ashely D. Evaluation and Competitive Tendering of BOT Power Plant Project in China. Journal of Construction Engineering and Management, Vol. 124, No. 4, July-Aug. 1998, pp. 333–341.
17. L. K. R. Competitive Advantage of Equity in BOT Tender. Journal of Construction Engineering and Management, ASCE, Vol. 121, No. 3, Sept. 1995, pp. 282–289.
18. Chandra F., and Chang L.-M. The Impact of Foreign Currency on BOT Projects. Construction Congress VI, Feb. 2000, pp. 878–888.
19. Tiong L. K. R. Comparative Study of BOT Projects. Journal of Construction Engineering and Management, ASCE, Vol. 6, No. 1, Jan. 1990, pp. 107–122.
20. Shen L., Lee R. K. H., and Zhang Z. Application of BOT System for Infrastructure Projects in China. Journal of Construction Engineering and Management, Vol. 122, No. 4, Dec. 1996, pp. 319–323.
21. Reina P. High-Risk B-O-T Players: A European Club. Public Works Financing, Vol. 91, Dec. 1995, pp. 20–21.
22. Reina P. Rising Risks Mark Big British BOT Bridge. Engineering News Records, Vol. 233, Issue 20, Dec. 1994, pp. 28–56.
23. Nahas C. Contrats de travaux d’exploitation et de transfert (BOT), le financement des travaux. Organisee par L’Union internationale des avocats avec la collaboration de l’Ordre des avocats de Beyrouth. Societe Generale Libano Europeenne de Banque (SGLEB), 1997.
24. Tiong L. K. R., Yeo K.-T., and McCarthy S. C. Critical Success Factors in Winning BOT Contracts. Journal of Construction Engineering and Management, ASCE, Vol. 118, No. 2, June 1992, pp. 217–228.
25. United Nations Commission on International Trade Law (UNCITRAL). Parties and Phases of Privately Financed Infrastructure Projects. Privately Financed Infrastructure Projects, A/cn.9/438/Add2, Chapter II, 30th session, Vienna, Austria, 1997.
26. Mahmassani G. L’allocation du risque dans les contrats BOT. Etude presente a la conference organisee par l’Union Internationale des avocats et le Bureau de Beyrouth sur les contrats BOT, Beirut, Lebanon, 1997.
27. United Nations Commission on International Trade Law (UNCITRAL). Introduction and Background Information. Privately Financed Infrastructure Projects, A/cn.9/444/Add2, Chapter V, 31st session, New York, 1998.
28. United Nations Commission on International Trade Law (UNCITRAL). Conclusion and General Terms of the Project Agreement. Privately Financed Infrastructure Projects, A/cn.9/444/Add5, Chapter V, 31 st session, New York, 1998.
29. United Nations Commission on International Trade Law (UNCITRAL). Preparatory Measures. Privately Financed Infrastructure Projects, A/cn.9/438/Add3, Chapter V, 30th session, Vienna, Austria, 1997.
30. Levy S. M. Build, Operate, Transfer: Paving the Way for Tomorrow’s Infrastructure. John Wiley & Sons, New York, 1996.

Cite article

Cite article

Cite article

OR

Download to reference manager

If you have citation software installed, you can download article citation data to the citation manager of your choice

Share options

Share

Share this article

Share with email
EMAIL ARTICLE LINK
Share on social media

Share access to this article

Sharing links are not relevant where the article is open access and not available if you do not have a subscription.

For more information view the Sage Journals article sharing page.

Information, rights and permissions

Information

Published In

Article first published: January 2001
Issue published: January 2001

Rights and permissions

© 2001 National Academy of Sciences.
Request permissions for this article.

Authors

Affiliations

Mohamed-Asem U. Abdul-Malak
American University of Beirut, 850 Third Avenue, 18th Floor, New York, NY 10022
Isam A. Kaysi
American University of Beirut, 850 Third Avenue, 18th Floor, New York, NY 10022
Marwan S. Schoucair
American University of Beirut, 850 Third Avenue, 18th Floor, New York, NY 10022

Metrics and citations

Metrics

Journals metrics

This article was published in Transportation Research Record: Journal of the Transportation Research Board.

VIEW ALL JOURNAL METRICS

Article usage*

Total views and downloads: 40

*Article usage tracking started in December 2016


Altmetric

See the impact this article is making through the number of times it’s been read, and the Altmetric Score.
Learn more about the Altmetric Scores



Articles citing this one

Receive email alerts when this article is cited

Web of Science: 0

Crossref: 2

  1. Performance Objectives Selection Model in Public-Private Partnership P...
    Go to citation Crossref Google Scholar
  2. Risk-Based Life-Cycle Cost Analysis of Privatized Infrastructure
    Go to citation Crossref Google Scholar

Figures and tables

Figures & Media

Tables

View Options

Get access

Access options

If you have access to journal content via a personal subscription, university, library, employer or society, select from the options below:


Alternatively, view purchase options below:

Purchase 24 hour online access to view and download content.

Access journal content via a DeepDyve subscription or find out more about this option.

View options

PDF/ePub

View PDF/ePub