Skip to main content
Intended for healthcare professionals
Restricted access
Research article
First published January 2001

Evaluating Design-Build Procurement Documents for Highway Projects: How Good Are They?

Abstract

Recent innovations by the Arizona Department of Transportation in the use of design-build procurement for highway construction are presented. Explosive population growth in Arizona has pushed the department to the limits of its capacity and challenged it to develop innovative ways to stretch its resources to meet the constituents’ needs. In 1996 the department spearheaded the passage of a pilot design-build law aimed at completing public construction projects more rapidly than could be done using traditional methods. An evaluation made of the procurement documents used for the second design-build project in this pilot program is described. The project reconstructed an extremely congested 12.9-km (8-mi) segment of Interstate 17, a primary artery carrying 180,000 vehicles per day through the city of Phoenix, widening it from 6 lanes to 10. The department used a two-step method for the selection of the winning design-build team from both a request for qualification and a request for proposal. Both documents were evaluated for the clarity of thought and the fairness of the point distribution methodology used by the selection teams. The responding teams were also surveyed about their costs expended during the proposal process. The primary method of data gathering was by written survey of all the proposing teams followed by unstructured interviews with responding principals. Analysis of the data gathered clearly showed the areas in which the procurement documents were unclear and in which the department needed to make corrections for future projects.

Get full access to this article

View all access and purchase options for this article.

References

1. Arizona Department of Transportation, Contracts and Specifications Sections and Engineering Consultant Section. Project Specifications Design-Build Project. Tracts No. 017MA201 and H447801, 447SPEC.DOC. Phoenix, 1998.
2. Arizona Department of Transportation, Engineering Consultant Section. Shortlist Panel Instruction for Review of Request for Qualifications Phoenix–Cordes Junction Highway (I-17) Design-Build Project. Tracts No. 017MA201 and H447801C. Phoenix, 1998.
3. Arizona Department of Transportation, Engineering Consultant Section. Selection Panel Instructions for Review of Technical Proposals Phoenix-Cordes Junction Highway (I-17) Design-Build Project. Tracts No. 017MA201 and H447801C. Phoenix, 1998.
4. Arizona Department of Transportation, Engineering Consultant Section. Oral Interview Instructions Packets Phoenix–Cordes Junction Highway (I-17) Design-Build Project. Tracts No. 017MA201 and H447801C. Phoenix, 1998.

Cite article

Cite article

Cite article

OR

Download to reference manager

If you have citation software installed, you can download article citation data to the citation manager of your choice

Share options

Share

Share this article

Share with email
EMAIL ARTICLE LINK
Share on social media

Share access to this article

Sharing links are not relevant where the article is open access and not available if you do not have a subscription.

For more information view the Sage Journals article sharing page.

Information, rights and permissions

Information

Published In

Article first published: January 2001
Issue published: January 2001

Rights and permissions

© 2001 National Academy of Sciences.
Request permissions for this article.

Authors

Affiliations

Jim Ernzen
Del E. Webb School of Construction, Arizona State University, Box 870204, Tempe, AZ 85287-0204
Ken Vogelsang
Del E. Webb School of Construction, Arizona State University, Box 870204, Tempe, AZ 85287-0204

Metrics and citations

Metrics

Journals metrics

This article was published in Transportation Research Record: Journal of the Transportation Research Board.

VIEW ALL JOURNAL METRICS

Article usage*

Total views and downloads: 23

*Article usage tracking started in December 2016


Altmetric

See the impact this article is making through the number of times it’s been read, and the Altmetric Score.
Learn more about the Altmetric Scores



Articles citing this one

Receive email alerts when this article is cited

Web of Science: 0

Crossref: 1

  1. Geotechnical Requirements in the Design–Build Selection Process
    Go to citation Crossref Google Scholar

Figures and tables

Figures & Media

Tables

View Options

Get access

Access options

If you have access to journal content via a personal subscription, university, library, employer or society, select from the options below:


Alternatively, view purchase options below:

Purchase 24 hour online access to view and download content.

Access journal content via a DeepDyve subscription or find out more about this option.

View options

PDF/ePub

View PDF/ePub