Skip to main content
Intended for healthcare professionals
Restricted access
Research article
First published online January 1, 2009

Analyzing the Duration and Prolongation of Performance-Based Contracts through Hazard-Based Duration and Zero-Inflated Random Parameters Poisson Models

Abstract

Performance-based contracts (PBCs) for roadway maintenance are emerging as a promising contracting approach that offers highway agencies enhanced project control and greater assurance of accountability and product quality. The duration of a PBC is typically longer than that of a traditional contract. Under a PBC, the contractor bears greater risk and responsibility for the final product and is obliged to undertake any required maintenance after the product is completed. A PBC period is typically considered prolonged if both the road agency and the contractor agree that the contract should be extended beyond the original completion date. This paper examines the relationships between PBC duration and prolongation on one hand, and the factors that affect these outcomes on the other hand, while accounting for unobserved heterogeneity. For the PBC duration model, a number of hazard-based function types are estimated. The Weibull model with gamma heterogeneity is found to provide the best fit. For the PBC prolongation model, a zero-inflated random parameters Poisson model is developed to estimate the probability and extent of PBC prolongation. Random variations in the parameter estimates are duly investigated. The size of the contract and whether the contract scope of work includes certain maintenance activities, among other factors, are found to influence the duration and prolongation of PBCs. This paper also computes and interprets elasticities and marginal effects, to shed more light on the individual effects of the influential variables.

Get full access to this article

View all access and purchase options for this article.

References

1. Hancher D. E. Contracting Methods for Highway Construction. TR News, No. 205, Nov.–Dec. 1999, pp. 10–14.
2. Stankevich N., Qureshi N., and Queiroz C. Contrats Basés Sur les Résultats Pour la Préservation et L'amélioration des Actifs Routiers. Transport Note TN–27. World Bank, Washington, D.C., 2005.
3. World Bank. Procurement of Works and Services Under Output- and Performance-Based Road Contracts: Sample Bidding Document. World Bank, Washington, D.C., September 2005. www.worldbank.org/WBSITE/EXTERNAL/PROJECTS/PROCUREMENT/0,contentMDK:20646773∼menuPK:84284∼pagePK:84269∼piPK:60001558∼theSitePK:84266,00.html. Accessed Jan. 15, 2007.
4. Anastasopoulos P. Ch. Performance-Based Contracting for Roadway Maintenance Operations in Indiana. MS thesis. Purdue University, West Lafayette, Ind., 2007.
5. Zietlow G. Cutting Costs and Improving Quality Through Performance-Based Road Management and Maintenance Contracts: The Latin American and OECD Experiences. Presented at Senior Road Executives Programme, Restructuring Road Management, University of Birmingham, United Kingdom, April 24–29, 2005.
6. FHWA. Highway Maintenance Contracting 2004. World State of Practices. Report of the National Highway Maintenance Contract Seminar, Orlando, Fla., 2005.
7. Liautaud G. Maintaining Roads: Experience with Output-Based Contracts in Argentina. World Bank, Washington D.C., 2004.
8. Segal G. F., Moore A. T., and McCarthy S. Contracting for Road and Highway Maintenance. Reason Public Policy Institute, Los Angeles, Calif., 2003.
9. Anastasopoulos P. Ch., Gkritza K., McCullouch B., Mannering F. L., and Sinha K. C. Performance-Based Contracting for Roadway Maintenance: An Exploratory Empirical Analysis. Presented at 10th International Conference on Applications of Advanced Technologies in Transportation, Athens, Greece, 2008.
10. Zietlow G. Using Micro-Enterprises to Create Local Contracting Capacity: The Latin American Experience. Presented at Senior Road Executives Programme, Restructuring Road Management, University of Birmingham, United Kingdom, April 24–29, 2005.
11. Prozzi J. A., and Madanat S. M. Using Duration Models to Analyze Experimental Pavement Failure Data. In Transportation Research Record: Journal of the Transportation Research Board, No. 1699, TRB, National Research Council, Washington, D.C., 2000, pp. 87–94.
12. Wang Y., Mahboub K. C., and Hancher D. E. Survival Analysis of Fatigue Cracking for Flexible Pavements Based on Long-Term Pavement Performance Data. Journal of Transportation Engineering, Vol. 131, No. 8, 2005, pp. 608–616.
13. Yu J. Pavement Service Life Estimation and Condition Prediction. Dissertation. University of Toledo, Ohio, 2005, p. 100.
14. Yang J. Estimation of Pavement Lifespan Using Stochastic Duration Models. Presented at 86th Annual Meeting of the Transportation Research Board, Washington, D.C., 2007.
15. Washington S., Karlaftis M., and Mannering F. Statistical and Econometric Methods for Transportation Data Analysis. Chapman & Hall/CRC, Boca Raton, Fla., 2003.
16. Heckman J., and Singer B. A Method for Minimizing the Impact of Distributional Assumptions in Econometric Models for Duration Data. Econometrica, Vol. 52, 1984, pp. 271–320.
17. Gourieroux C., Monfort A., and Trogon A. Pseudo Maximum Likelihood Methods: Theory. Econometrica, Vol. 52, 1984, pp. 681–700.
18. Jain D. C., and Vilcassim N. J. Investigating Household Purchase Timing Decisions: A Conditional Hazard Function Approach. Marketing Science, Vol. 10, No. 1, 1991, pp. 1–23.
19. Shankar V., Milton J., and Mannering F. Modeling Accident Frequencies as Zero-Altered Probability Processes: An Empirical Inquiry. Accident Analysis and Prevention, Vol. 29, No. 6, 1997, pp. 829–837.
20. Greene W. Limdep, Version 9.0. Econometric Software, Inc., Plain-view, N.Y., 2007.
21. Anastasopoulos P. Ch., and Mannering F. L. A Note on Random Parameters Negative Binomial Analysis of Vehicle-Accident Frequencies. Accident Analysis and Prevention, Vol. 41, No. 1, 2009, pp. 153–159.
22. Bhat C. Simulation Estimation of Mixed Discrete Choice Models Using Randomized and Scrambled Halton Sequences. Transportation Research Part B, Vol. 37, No. 1, 2003, pp. 837–855.
23. Train K. Halton Sequences for Mixed Logit. Working paper. Department of Economics, University of California, Berkeley, 1999.
24. Shankar V. N., Albin R. B., Milton J. C., and Mannering F. L. Evaluating Median Crossover Likelihoods with Clustered Accident Counts: An Empirical Inquiry Using the Random Effects Negative Binomial Model. In Transportation Research Record 1635, TRB, National Research Council, Washington, D.C., 1998, pp. 44–48.
25. Vuong Q. Likelihood Ratio Tests for Model Selection and Non-Nested Hypotheses. Econometrica, Vol. 57, 1989, pp. 307–334.
26. Zietlow G. Implementing Performance-Based Road Management and Maintenance Contracts in Developing Countries: An Instrument of German Technical Cooperation. Eschborn, Germany, Nov. 2004. http://zietlow.com/docs/PBMMC-GTZ.pdf.
27. Pakkala P. Performance-Based Contracts: International Experiences. Finnish Road Administration. Presented at Transportation Research Board Workshop on Performance-Based Contracting, April 27, 2005, Washington, D.C.
28. Porter T. International Trends in Procurement Models for Highway Maintenance. Opus International Consultants, Ltd., 2002. www.opus.co.nz. Accessed Sept. 23, 2006.
29. Robinson M. D., Raynault E., Frazer W., Lakew M., Rennie S., and Sheldahl E. DC Streets Performance-Based Asset Preservation Experiment: Current Quantitative Results and Suggestions for Future Contracts. Presented at 85th Annual Meeting of the Transportation Research Board, Washington, D.C., 2006.
30. Anderson T. W., and Darling D. A. Asymptotic Theory of Certain “Goodness of Fit” Criteria Based on Stochastic Processes. Annals of Mathematical Statistics, Vol. 23, No. 2, 1952, pp. 193–212.
31. Stephens M. A. EDF Statistics for Goodness of Fit and Some Comparisons. Journal of the American Statistical Association, Vol. 69, 1974, pp. 730–737.
32. Milton J., Shankar V., and Mannering F. Highway Accident Severities and the Mixed Logit Model: An Exploratory Empirical Analysis. Accident Analysis and Prevention, Vol. 40, No. 1, 2008, pp. 260–266.
33. Train K. Discrete Choice Methods with Simulation. Cambridge University Press, Cambridge, United Kingdom, 2003.

Cite article

Cite article

Cite article

OR

Download to reference manager

If you have citation software installed, you can download article citation data to the citation manager of your choice

Share options

Share

Share this article

Share with email
EMAIL ARTICLE LINK
Share on social media

Share access to this article

Sharing links are not relevant where the article is open access and not available if you do not have a subscription.

For more information view the Sage Journals article sharing page.

Information, rights and permissions

Information

Published In

Article first published online: January 1, 2009
Issue published: January 2009

Rights and permissions

© 2009 National Academy of Sciences.
Request permissions for this article.

Authors

Affiliations

Panagiotis Ch. Anastasopoulos
School of Civil Engineering, Purdue University, 550 Stadium Mall Drive, West Lafayette, IN 47907.
Samuel Labi
School of Civil Engineering, Purdue University, 550 Stadium Mall Drive, West Lafayette, IN 47907.
Bob G. McCullouch
School of Civil Engineering, Purdue University, 550 Stadium Mall Drive, West Lafayette, IN 47907.

Notes

Metrics and citations

Metrics

Journals metrics

This article was published in Transportation Research Record: Journal of the Transportation Research Board.

VIEW ALL JOURNAL METRICS

Article usage*

Total views and downloads: 82

*Article usage tracking started in December 2016


Altmetric

See the impact this article is making through the number of times it’s been read, and the Altmetric Score.
Learn more about the Altmetric Scores



Articles citing this one

Receive email alerts when this article is cited

Web of Science: 0

Crossref: 25

  1. Cost Comparison of Highway Rest Area Operations: In-House Workforce ve...
    Go to citation Crossref Google Scholar
  2. Hazard-based duration analysis of the time between motorcyclists’ init...
    Go to citation Crossref Google Scholar
  3. Hazard-Based Duration Models for Predicting Actual Duration of Highway...
    Go to citation Crossref Google Scholar
  4. Identifying elderly travel time disparities using a correlated grouped...
    Go to citation Crossref Google Scholar
  5. Investigation of contributing factors to extremely severe traffic cras...
    Go to citation Crossref Google Scholar
  6. A statistical analysis of the dynamics of household hurricane-evacuati...
    Go to citation Crossref Google Scholar
  7. Praxis of Performance Measurement in Public-Private Partnerships: Movi...
    Go to citation Crossref Google Scholar
  8. Chapter 2. Design of Local Roadway Infrastructure to Service Sustainab...
    Go to citation Crossref Google Scholar
  9. The effect of speed limits on drivers' choice of speed: A random param...
    Go to citation Crossref Google Scholar
  10. Performance-based contracting: a literature review and future research...
    Go to citation Crossref Google Scholar
  11. Analysis of Pavement Overlay and Replacement Performance Using Random ...
    Go to citation Crossref Google Scholar
  12. Conceptual Framework for the Performance Measurement of Public-Private...
    Go to citation Crossref Google Scholar
  13. Design of local roadway infrastructure to service sustainable energy f...
    Go to citation Crossref Google Scholar
  14. Cost Overrun in Public-Private Partnerships: Toward Sustainable Highwa...
    Go to citation Crossref Google Scholar
  15. Improving Systemwide Sustainability in Pavement Preservation Programmi...
    Go to citation Crossref Google Scholar
  16. The Built Environment and Walking Activity of the Elderly: An Empirica...
    Go to citation Crossref Google Scholar
  17. Probability distribution fitting of schedule overruns in construction ...
    Go to citation Crossref Google Scholar
  18. Large Truck–Involved Crashes: Exploratory Injury Severity Analysis
    Go to citation Crossref Google Scholar
  19. Built Environment and Household Electric Bike Ownership...
    Go to citation Crossref Google Scholar
  20. Delivering Local Infrastructure through PPPs: Evidence from the School...
    Go to citation Crossref Google Scholar
  21. Empirical Assessment of the Likelihood and Duration of Highway Project...
    Go to citation Crossref Google Scholar
  22. Hazard-Based Analysis of Travel Distance in Urban Environments: Longit...
    Go to citation Crossref Google Scholar
  23. Household Automobile and Motorcycle Ownership Analyzed with Random Par...
    Go to citation Crossref Google Scholar
  24. Comparative Evaluation of Public–Private Partnerships in Roadway Prese...
    Go to citation Crossref Google Scholar
  25. Effects of Pavement Spatial Variability on Contractor’s Management Str...
    Go to citation Crossref Google Scholar

Figures and tables

Figures & Media

Tables

View Options

Get access

Access options

If you have access to journal content via a personal subscription, university, library, employer or society, select from the options below:


Alternatively, view purchase options below:

Purchase 24 hour online access to view and download content.

Access journal content via a DeepDyve subscription or find out more about this option.

View options

PDF/ePub

View PDF/ePub