Skip to main content
Intended for healthcare professionals
Restricted access
Research article
First published online January 1, 2011

Evaluation of Potential Long-Term Durability of Joints Cut with Early-Entry Saws on Rigid Pavements

Abstract

Early-entry sawing is an attractive operation to expedite the construction of jointed concrete pavements; however, there are some concerns that early-entry sawing may compromise the pavement's long-term performance. The Illinois Department of Transportation initiated this study as an initial effort to investigate the durability of joints sawed by using early-entry sawing. Joint performance as a function of saw-cut depth and timing was also considered. The study was integrated into an active construction project along Illinois Route 59 in Plainfield. During construction, paving and sawing operations were observed and documented; of particular interest were the sawing operations, during which signs of surface scarring, joint raveling, and slab edge breakouts were recorded and the extent of sawing-related damage was subjectively assessed. In addition to general observations, climatic conditions were monitored, as was pavement temperature from time of paving onward. Ambient climate conditions, portland cement concrete mixture, and slab temperature data were used to perform a HIPERPAV analysis to assess the potential for early-age cracking. Compressive strength cylinders were also cast and tested at 3, 7, and 28 days. In addition, cores were retrieved from joints throughout the test section and a battery of durability tests—including petrographic analysis, freeze–thaw testing, and resistance to salt scaling—was conducted. Overall observations from the field construction and findings from the laboratory testing indicate that the use of early-entry sawing is viable and that joint durability is not compromised.

Get full access to this article

View all access and purchase options for this article.

References

1. Okamoto P. A., Nussbaum P. J., Smith K. D., Darter M. I., Wilson T. P., Wu C. L., and Tayabji S. D. Guidelines for Timing Contraction Joint Sawing and Earliest Loading for Concrete Pavements, Volume I. Final Report FHWA-RD-91-079. FHWA, U.S. Department of Transportation, 1994.
2. Smith K. D. Early-Entry Sawing of Portland Cement Concrete Pavements. CPTP Tech Brief. FHWA-HIF-07-031. FHWA, U.S. Department of Transportation, June 2007.
3. Concrete Paving Workforce Reference No. 3: Concrete Pavement Joint Sawing, Cleaning, and Sealing. Center for Portland Cement Concrete Pavement Technology, Iowa State University, Ames, 2004.
4. Zollinger D. G., Tang T., and Xin D. Sawcut Depth Considerations for Jointed Concrete Pavement Based on Fracture Mechanics Analysis. In Transportation Research Record 1449, TRB, National Research Council, Washington, D.C., 1994, pp. 91–100.
5. Balogh A. Diamond Blades for Cutting Concrete Buyer's Guide: How to Choose the Right Diamond Saw Blade for Cutting Concrete. Concrete Network. http://www.concretenetwork.com/saw-blade-buyers-guide/. Accessed June 30, 2010.
6. McGovern M. The Latest on Early-Entry Sawing. Concrete Technology Today, Vol. 23, No. 23, 2002.
7. Guide for Concrete Floor and Slab Construction. ACI-302.1R-04. American Concrete Institute, Farmington Hills, Mich., 2004.
8. Guide for Design of Pavement Structures. AASHTO, Washington, D.C., 1993.
9. ARA, Inc., ERES Consultants Division. Guide for Mechanistic–Empirical Design of New and Rehabilitated Pavement Structures. Final report, NCHRP Project 1-37A. Transportation Research Board of the National Academies, Washington, D.C., 2004. http://www.trb.org/mepdg/guide.htm.
10. American Concrete Pavement Association. Database of State DOT Concrete Pavement Practices. http://apps.acpa.org/apps/APD.aspx. Accessed Feb. 10, 2011.
11. Steffes R., and Siljenberg B. J. Early Entry Sawed PCC Transverse Joint Ends. Report MLR-97-5. Iowa Department of Transportation, Ames, 2003.
12. Wang K., Hu J., Bektas F., Taylor P., and Ceylan H. Crack Development in Ternary Mix Concrete Utilizing Various Saw Depths. National Concrete Pavement Technology Center, Iowa State University, Ames, 2009.
13. Scofield L. Sealant Effectiveness Study: SR59 SB Roadway Joint Sealant Experiment. American Concrete Pavement Association, Skokie, Ill., 2009.
14. HIPERPAV. Implementation: State DOT. http://www.hiperpav.com/index.php?q=node/42. Accessed Feb. 10, 2011.
15. Krstulovich J., Van Dam T., and Smith K. Evaluation of the Long-Term Durability of Rigid Pavement Joints Cut Using Early-Entry Saws. Illinois Center for Transportation Series No. 11-076. Publication No. FHWA-ICT-11-076. http://ict.illinois.edu/publications/report%20files/FHWA-ICT-11-076.pdf.

Cite article

Cite article

Cite article

OR

Download to reference manager

If you have citation software installed, you can download article citation data to the citation manager of your choice

Share options

Share

Share this article

Share with email
EMAIL ARTICLE LINK
Share on social media

Share access to this article

Sharing links are not relevant where the article is open access and not available if you do not have a subscription.

For more information view the Sage Journals article sharing page.

Information, rights and permissions

Information

Published In

Article first published online: January 1, 2011
Issue published: January 2011

Rights and permissions

© 2011 National Academy of Sciences.
Request permissions for this article.

Authors

Affiliations

James M. Krstulovich, Jr.
Applied Pavement Technology, 115 West Main Street, Suite 400, Urbana, IL 61801.
Thomas Van Dam
Applied Pavement Technology, 200 Michigan Street, Suite 719, Hancock, MI 49930.
Kurt D. Smith
Applied Pavement Technology, 115 West Main Street, Suite 400, Urbana, IL 61801.
Mark Gawedzinski
Illinois Department of Transportation, Bureau of Materials and Physical Research, 126 East Ash Street, Springfield, IL 62704.

Notes

Metrics and citations

Metrics

Journals metrics

This article was published in Transportation Research Record: Journal of the Transportation Research Board.

VIEW ALL JOURNAL METRICS

Article usage*

Total views and downloads: 17

*Article usage tracking started in December 2016


Altmetric

See the impact this article is making through the number of times it’s been read, and the Altmetric Score.
Learn more about the Altmetric Scores



Articles citing this one

Receive email alerts when this article is cited

Web of Science: 0

Crossref: 5

  1. Noncontact Ultrasonic and Computer Vision Assessment for Sawcut Initia...
    Go to citation Crossref Google Scholar
  2. Investigation into enhancing and evaluating curing efficiency of joint...
    Go to citation Crossref Google Scholar
  3. Effect of Curing Methods on Quality of Concrete Joints: Experimental a...
    Go to citation Crossref Google Scholar
  4. Field Evaluation of Precut Thermal Cracks in an AC Pavement in Alaska
    Go to citation Crossref Google Scholar
  5. Field performance of concrete pavements with short slabs and design pr...
    Go to citation Crossref Google Scholar

Figures and tables

Figures & Media

Tables

View Options

Get access

Access options

If you have access to journal content via a personal subscription, university, library, employer or society, select from the options below:


Alternatively, view purchase options below:

Purchase 24 hour online access to view and download content.

Access journal content via a DeepDyve subscription or find out more about this option.

View options

PDF/ePub

View PDF/ePub